Status:
Planned
Type:
Offices
Location:
Bottova, Staré Mesto
Planned start of construction:
2027
Planned end of construction:
2029
Architect:
Čechvala Architects
Back to projects

The new headquarters of Západoslovenská energetika (ZSE) will be a technologically unique building, particularly in terms of energy efficiency. This is a carbon-neutral building not only in terms of its operation but, for the first time on the Slovak market, also in terms of project construction.

Sustainable headquarters in the heart of Bratislava

The new ZSE headquarters will provide modern and sustainable office space for approximately 750 employees. Its prime location in downtown Bratislava will offer a natural connection to our next project – the adjacent residence on Bottova Street. Together, these projects will form a harmonious whole and a pleasant place for work, living and culture in the form of a renewed Design Factory.
The future headquarters stands out due to the comprehensive analysis of every material used. The outcome is a meticulously designed energy concept that operates similarly to so-called passive houses, achieving a reduction in embodied carbon of up to 40%. The building will also lead in energy efficiency, with operating cost savings of up to 70% compared to conventional buildings.
Green from the co.re
Discover more
Immocap

Following the successful completion of headquarters for Orange and Henkel, we are now embarking on the construction of another headquarters. This one for ZSE will be groundbreaking as the first building in Slovakia to achieve carbon neutrality not only in operation but also during the construction phase.

Team

The architectural design by Čechvala Architects focuses on simplicity of mass, creating a calming effect and blending into the surroundings. Emphasis is placed on details, colour and materials that allow the facades to shift their "mood" throughout the day. In collaboration with our experts at Immocap, an energy concept has been developed that will make the building carbon neutral during both the construction and operational phases.

More
Projects

The project reflects ZSE's commitment to sustainability. It will be an exceptional energy-efficient building that aligns with the company's vision. It will be state-of-the-art not only by Bratislava standards.

More
Sustainability

When designing the ZSE headquarters, we focused on optimising energy efficiency, seamlessly integrating it with a carefully crafted and sustainable energy concept.

A detailed environmental impact analysis (LCA) provided a solid foundation for creating a carbon-neutral building with minimal reliance on offset programs.

More

The building will lead in energy efficiency with operating cost savings of up to 70% compared to other buildings of this type.

Care

On the ZSE site, there is also an industrial building, formerly a locksmith's workshop, also known as the Design Factory. We will integrate this historic landmark into our upcoming project, a residence on Bottova Street, preserving the heritage of the site.